Increasing Pipeline Capacity by Using Multiphase Pumps

Thursday, 17. Apr 2008
Offshore space, weight and power constraints made it necessary, to install the Multiphase Boosting System onshore. At the terminal the pipeline end pressure is reduced to enable increased flow to shore. Twice 100 % capacity are installed delivering 2500 m³/h continuously.
eZ publish™ copyright © 1999-2008 eZ systems as